Friday, June 10, 2011

From September 2010

I transfered the drawings from the plans on to brown paper
and built the part right on top.

This is my rib building station.

Here is the gusset station.

Rib building.



Finished rib. Ready for gussets.


Triming the gussets.


Tape measure races in the shop.

No comments:

Post a Comment